The utility model relates to a test device and a method for water inrush and erosion prevention of a mine collapse column under the action of the pressure water seepage. On the bottom plate of the tank body is arranged in the lower groove notch, a pipe connecting hole and groove is fixedly connected under the tank body of the regulator pump through a hose and connecting pipe communicated with a fixed cylinder, vertically arranged in the tank body, the column body is provided with a plurality of holes. The sponge cover is sheathed on the cylinder cover is outside the sponge tightly wrapped with at least one metal net cover, the outside of the outer surface of the metal mesh is tightly sheathed with a plurality of clamping ring, a plurality of clamping ring and the upper body can be detachably connected, the connection pipe two is fixed on the bottom of the column, a connecting pipe two and the other end of the connecting pipe and a removable sealing connection. It is more realistic to simulate the process of the collapse of the confined water, and to study the geological characteristics of the surrounding rock and the reasonable retention of the protective coal pillar.
【技術(shù)實(shí)現(xiàn)步驟摘要】
本專利技術(shù)涉及一種礦井陷落柱突水防沖刷試驗(yàn)裝置及方法,尤其是一種承壓水滲流作用下礦井陷落柱突水防沖刷試驗(yàn)裝置及方法。
技術(shù)介紹
礦井生產(chǎn)過程中,煤層受到陷落柱的嚴(yán)重威脅,如何合理留設(shè)陷落柱保護(hù)煤柱防止陷落柱突水是確保工作面安全生產(chǎn)的重要難題。保護(hù)煤柱留設(shè)過大造成資源浪費(fèi),留設(shè)過小則存在安全隱患。因此,研究陷落柱突水機(jī)理并確定陷落柱保護(hù)煤柱的合理尺寸,對于礦井生產(chǎn)具有重要意義。目前,陷落柱問題逐漸受到了工程人員和科技工作者的重視,但關(guān)于陷落柱突水的試驗(yàn)研究卻非常少,排水條件下三維相似物理模擬試驗(yàn)更是幾乎空白。現(xiàn)有礦井陷落柱突水試驗(yàn)裝置中承壓水的模擬為不排水條件,忽略了水流循環(huán)對巖層的侵蝕作用,高壓水流容易沖垮模擬巖層,缺乏真實(shí)性。
技術(shù)實(shí)現(xiàn)思路
本專利技術(shù)的目的在于提供一種承壓水滲流作用下礦井陷落柱突水防沖刷試驗(yàn)裝置及方法,它能夠更加真實(shí)的模擬承壓水作用下陷落柱滲透擴(kuò)展的過程,輔助研究承壓水滲流作用下陷落柱周邊圍巖地質(zhì)特征以及保護(hù)煤柱的合理留設(shè)。實(shí)現(xiàn)上述目的,本專利技術(shù)的一種承壓水滲流作用下礦井陷落柱突水防沖刷試驗(yàn)裝置,包括試驗(yàn)臺架、穩(wěn)流裝置、連接管一、軟管以及穩(wěn)壓水泵,所述的試驗(yàn)臺架包括上槽體以及下槽體,所述的上槽體底板放置在下槽體槽口處,上槽體前立面為透明板,上槽體底板上設(shè)有一個通孔和若干個排水口,所述的連接管一一端與所述的通孔固定連接,所述的下槽體內(nèi)放置有穩(wěn)壓水泵,所述的穩(wěn)壓水泵出水端通過軟管與連接管一另一端固定連通,所述的穩(wěn)流裝置包括柱體、海綿罩、連接管二、至少一個金屬網(wǎng)罩以及若干個卡環(huán),所述的柱體豎直設(shè)置在上槽體內(nèi)的底板上方,柱體設(shè)有用于儲水的中心腔 ...
【技術(shù)保護(hù)點(diǎn)】
一種承壓水滲流作用下礦井陷落柱突水防沖刷試驗(yàn)裝置,其特征在于:包括試驗(yàn)臺架(1)、穩(wěn)流裝置(2)、連接管一(3)、軟管(4)以及穩(wěn)壓水泵(5),所述的試驗(yàn)臺架(1)包括上槽體(1?1)以及下槽體(1?2),所述的上槽體(1?1)底板放置在下槽體(1?2)槽口處,上槽體(1?1)前立面為透明板,上槽體(1?1)底板上設(shè)有一個通孔和若干個排水口(9?2),所述的連接管一(3)一端與所述的通孔固定連接,所述的下槽體(1?2)內(nèi)放置有穩(wěn)壓水泵(5),所述的穩(wěn)壓水泵(5)出水端通過軟管(4)與連接管一(3)另一端固定連通,所述的穩(wěn)流裝置(2)包括柱體(2?1)、海綿罩(2?2)、連接管二(2?5)、至少一個金屬網(wǎng)罩(2?3)以及若干個卡環(huán)(2?4),所述的柱體(2?1)豎直設(shè)置在上槽體(1?1)內(nèi)的底板上方,柱體(2?1)設(shè)有用于儲水的中心腔,柱體(2?1)頂部以及側(cè)壁均設(shè)有若干個出水孔(9?1),所述的海綿罩(2?2)套裝在柱體(2?1)外側(cè),海綿罩(2?2)的外側(cè)緊密套裝有至少一個金屬網(wǎng)罩(2?3),設(shè)置在最外側(cè)的金屬網(wǎng)罩(2?3)的外表面緊密套裝有若干個卡環(huán)(2?4),所述的若干個卡環(huán)(2 ...
【技術(shù)特征摘要】
1.一種承壓水滲流作用下礦井陷落柱突水防沖刷試驗(yàn)裝置,其特征在于:包括試驗(yàn)臺架(1)、穩(wěn)流裝置(2)、連接管一(3)、軟管(4)以及穩(wěn)壓水泵(5),所述的試驗(yàn)臺架(1)包括上槽體(1-1)以及下槽體(1-2),所述的上槽體(1-1)底板放置在下槽體(1-2)槽口處,上槽體(1-1)前立面為透明板,上槽體(1-1)底板上設(shè)有一個通孔和若干個排水口(9-2),所述的連接管一(3)一端與所述的通孔固定連接,所述的下槽體(1-2)內(nèi)放置有穩(wěn)壓水泵(5),所述的穩(wěn)壓水泵(5)出水端通過軟管(4)與連接管一(3)另一端固定連通,所述的穩(wěn)流裝置(2)包括柱體(2-1)、海綿罩(2-2)、連接管二(2-5)、至少一個金屬網(wǎng)罩(2-3)以及若干個卡環(huán)(2-4),所述的柱體(2-1)豎直設(shè)置在上槽體(1-1)內(nèi)的底板上方,柱體(2-1)設(shè)有用于儲水的中心腔,柱體(2-1)頂部以及側(cè)壁均設(shè)有若干個出水孔(9-1),所述的海綿罩(2-2)套裝在柱體(2-1)外側(cè),海綿罩(2-2)的外側(cè)緊密套裝有至少一個金屬網(wǎng)罩(2-3),設(shè)置在最外側(cè)的金屬網(wǎng)罩(2-3)的外表面緊密套裝有若干個卡環(huán)(2-4),所述的若干個卡環(huán)(2-4)與上槽體(1-1)前立面內(nèi)壁可拆卸連接,所述的連接管二(2-5)一端固定在柱體(2-1)底部設(shè)有的連接孔內(nèi),連接管二(2-5)另一端與連接管一(3)一端可拆卸密封連通。2.根據(jù)權(quán)利要求1所述的一種承壓水滲流作用下礦井陷落柱突水防沖刷試驗(yàn)裝置,其特征在于:所述的連接管一(3)所述的一端制有外螺紋,所述的連接管二(2-5)所述的另一端制有相匹配的內(nèi)螺紋,連接管二(2-5)另一端與連接管一(3)一端螺紋連接。3.根據(jù)權(quán)利要求1或2所述的一種承壓水滲流作用下礦井陷落柱突水防沖刷試驗(yàn)裝置,其特征在于:所...
【專利技術(shù)屬性】
技術(shù)研發(fā)人員:李見波,劉玉德,王新梅,
申請(專利權(quán))人:華北科技學(xué)院,
類型:發(fā)明
國別省市:河北;13
還沒有人留言評論。發(fā)表了對其他瀏覽者有用的留言會獲得科技券。