The present invention relates to a ship for underwater tunnel engineering and its construction method, the project by the ship after the section and the middle segment, the upper engineering ship above water; after both engineering ship and tunnel water sealing section is concrete, the water to prevent water from the tunnel and the rear section of the middle the joint into the concrete filled the tunnel bottom and side walls and rock the space between the end section and tunnel opening pipe sections of the same; the middle segment is tunnel construction section, construction of pipe section in the middle section of the rear cabin, and has completed the original construction of connecting pipe section, the middle section is provided with a top front push device; a mining geotechnical section. Advantages: small amount of earthwork excavation, the engineering ship in U type front cabin semi open in mining soil, construction is convenient, because both sides of wall type U module on the foundation pit supporting role, so a small amount of excavation; quick and safe construction, all construction operations are completed in ship engineering.
【技術(shù)實(shí)現(xiàn)步驟摘要】
一種用于水下隧道的工程船及其施工法
本專利技術(shù)涉及的是一種用于水下隧道的工程船及其施工法,屬于土木工程基礎(chǔ)施工
技術(shù)介紹
現(xiàn)有水下隧道的施工一般采用盾構(gòu)法和沉管法,盾構(gòu)法施工時(shí)對水面的影響小,但掘進(jìn)機(jī)造價(jià)高昂,施工周期長;沉管法對施工條件要求較高,適用于水道河床穩(wěn)定、水流不能過急的水域,而且土方開挖量大。
技術(shù)實(shí)現(xiàn)思路
本專利技術(shù)提出的是一種用于水下隧道的工程船及其施工法,其目的旨在克服現(xiàn)有技術(shù)存在的缺陷,由于工程船前段在半敞開式的U型艙內(nèi)挖掘巖土,施工方便,由于U型艙的兩側(cè)墻對基坑的支護(hù)作用,土方開挖量小;中間段自帶推定裝置,工程船行走方便,挖掘巖土快捷。本專利技術(shù)的技術(shù)方案:工程船由后段、中間段和前段組成,工程船的上部高于水面;后段既是工程船與隧道密封止水段也是混凝土灌注段,止水時(shí)防止水從隧道與后部接縫進(jìn)入中間段,使混凝土充滿隧道底板和兩側(cè)板與巖土間的空間,尾端開口的截面與隧道管節(jié)截面相同;中間段是隧道施工段,在中間段的后部艙室進(jìn)行管節(jié)施工,完成與原有已施工管節(jié)的連接,中間段的前部安裝有頂推裝置;前段是挖掘巖土段。前段由U型艙和挖掘裝置組成,U型艙由兩側(cè)墻和底板組成,即U型艙的前部和上部均開口,U型艙的兩側(cè)墻和底板的前端均設(shè)有鏈刀運(yùn)行的軌道,兩側(cè)墻和底板內(nèi)還設(shè)有鏈刀運(yùn)行的軌道;挖掘裝置由傳動裝置和鏈刀組成,傳動裝置由驅(qū)動裝置和鏈輪組成,鏈刀由鏈條和固定于鏈條上的刀具組成;施工時(shí)驅(qū)動裝置驅(qū)動鏈刀,鏈刀沿著軌道運(yùn)行,U型艙前端軌道上的鏈刀僅挖掘兩側(cè)板和底板前方的巖土,兩側(cè)板前端挖掘巖土的鏈刀從下往上運(yùn)行時(shí)將已挖掘的巖土帶至上方,底板前端挖掘巖土的鏈刀 ...
【技術(shù)保護(hù)點(diǎn)】
一種用于水下隧道的工程船,其特征是工程船由后段、中間段和前段組成,工程船的上部高于水面;后段既是工程船與隧道密封止水段也是混凝土灌注段,止水時(shí)防止水從隧道與后部接縫進(jìn)入中間段,使混凝土充滿隧道底板和兩側(cè)板與巖土間的空間,尾端開口的截面與隧道管節(jié)截面相同;中間段是隧道施工段,在中間段的后部艙室進(jìn)行管節(jié)施工,完成與原有已施工管節(jié)的連接,中間段的前部安裝有頂推裝置;前段是挖掘巖土段。
【技術(shù)特征摘要】
1.一種用于水下隧道的工程船,其特征是工程船由后段、中間段和前段組成,工程船的上部高于水面;后段既是工程船與隧道密封止水段也是混凝土灌注段,止水時(shí)防止水從隧道與后部接縫進(jìn)入中間段,使混凝土充滿隧道底板和兩側(cè)板與巖土間的空間,尾端開口的截面與隧道管節(jié)截面相同;中間段是隧道施工段,在中間段的后部艙室進(jìn)行管節(jié)施工,完成與原有已施工管節(jié)的連接,中間段的前部安裝有頂推裝置;前段是挖掘巖土段。2.根據(jù)權(quán)利要求1所述的一種用于水下隧道的工程船,其特征是所述的前段由U型艙和挖掘裝置組成,U型艙由兩側(cè)墻和底板組成,即U型艙的前部和上部均開口,U型艙的兩側(cè)墻和底板的前端均設(shè)有鏈刀運(yùn)行的軌道,兩側(cè)墻和底板內(nèi)還設(shè)有鏈刀運(yùn)行的軌道;挖掘裝置由傳動裝置和鏈刀組成,傳動裝置由驅(qū)動裝置和鏈輪組成,鏈刀由鏈條和固定于鏈條上的刀具組成;施工時(shí)驅(qū)動裝置驅(qū)動鏈刀,鏈刀沿著軌道運(yùn)行,U型艙前端軌道上的鏈刀僅挖掘兩側(cè)板和底板前方的巖土,兩側(cè)板前端挖掘巖土的鏈刀從下往上運(yùn)行時(shí)將已挖掘的巖土帶至上方,底板前端挖掘巖土的鏈刀從前往后運(yùn)行時(shí)將已挖掘的巖土帶至后方或經(jīng)巖土輸送機(jī)送出。3.根據(jù)權(quán)利要求1所述的一種用于水下隧道的工程船,其特征是所述的前段由兩側(cè)板和位于兩側(cè)板前端的挖掘裝置組成,即前段的前部和上下均開口,兩側(cè)板的前端設(shè)有鏈刀運(yùn)行的軌道,兩側(cè)板還設(shè)有鏈刀運(yùn)行的軌道;挖掘裝置由傳動裝置和鏈刀組成,傳動裝置由驅(qū)動裝置和鏈輪組成,鏈刀由鏈條和固定于鏈條上的刀具組成;施工時(shí)驅(qū)動裝置驅(qū)動鏈刀,鏈刀沿著軌道運(yùn)行,前端軌道上的鏈刀僅挖掘兩側(cè)墻前方的巖土,鏈刀從下往上運(yùn)行時(shí)將已挖掘的巖土帶至上方。4.根據(jù)權(quán)利要求2、3所述的一種用于水下隧道的工程船,其特征...
【專利技術(shù)屬性】
技術(shù)研發(fā)人員:王燏斌,
申請(專利權(quán))人:王燏斌,
類型:發(fā)明
國別省市:江蘇,32