The invention discloses a construction structure and construction method of cast-in-place span hanging basket and truss guide beam edge based on the construction structure comprises a hanging basket, hanging basket hanging basket front beam, a rear cross beam, truss girder system, side formwork system, pre ballast system and counterweight system; truss the guide unit truss system comprises a plurality of frames and arranged in the bottom mold unit truss above the unit truss comprises an upper chord and bottom chord and abdominal connecting rod, abdominal bar is composed of a plurality of vertical web member and a plurality of components to the oblique abdominal rod, two diagonal struts are arranged between a vertical chord; the bottom die comprises a horizontal frame multi frames are the main distribution in the multi span truss beam at the top of the unit, two adjacent frames are the main distribution beam is arranged between a square, square and the main distribution above the beam is paved with bamboo plywood. The invention provides a construction method of the structure construction, through the construction of structure construction can effectively avoid the safety bracket method leads to poor, poor terrain construction encountered difficulty coefficient is high, long construction period, construction technical problems of high cost.
【技術(shù)實現(xiàn)步驟摘要】
基于掛籃與桁架式導(dǎo)梁的邊跨現(xiàn)澆段施工結(jié)構(gòu)及施工方法
本專利技術(shù)屬于連續(xù)剛構(gòu)橋施工領(lǐng)域,具體涉及一種基于掛籃與桁架式導(dǎo)梁的邊跨現(xiàn)澆段施工結(jié)構(gòu)及施工方法。
技術(shù)介紹
連續(xù)剛構(gòu)架橋梁的梁體,按施工部位劃分,包括墩頂現(xiàn)澆段、懸澆段、邊跨現(xiàn)澆段和合攏段,施工順序為:先施工墩頂現(xiàn)澆段,之后在墩頂現(xiàn)澆段上安裝掛籃,對稱懸臂施工懸澆段,在懸澆段施工完成之前,將邊跨懸澆段施工完成,最后施工合攏段。邊跨現(xiàn)澆段是梁體結(jié)構(gòu)的一部分,位于連續(xù)梁的兩端,邊跨現(xiàn)澆段一端搭在邊墩上,另一端懸空。施工時,須搭設(shè)支架,在其上施工該段梁體,待施工完合攏段后,各段梁體形成一個整體,方可拆除支架,采用支架法施工時存在以下缺點:1.當(dāng)邊跨現(xiàn)澆段離地面較高時,搭設(shè)支架危險性大,所用材料較多,增加建造成本;2.由于邊跨現(xiàn)澆段只在邊墩一側(cè)設(shè)置,為了解決施工時邊墩受力的不平衡,需在另一側(cè)配重或者增加下拉裝置,增加了施工難度;3.如果邊跨處于地勢較差的山坡上,開挖的面積較大,對地表破壞大,同時修建施工平臺難度系數(shù)大。
技術(shù)實現(xiàn)思路
本專利技術(shù)所要解決的技術(shù)問題在于針對上述現(xiàn)有技術(shù)中的不足,提供一種基于掛籃與桁架式導(dǎo)梁的邊跨現(xiàn)澆段施工結(jié)構(gòu)。該基于掛籃與桁架式導(dǎo)梁的邊跨現(xiàn)澆段施工結(jié)構(gòu)替換了現(xiàn)有支架法施工技術(shù),有效避免了現(xiàn)有支架法導(dǎo)致的安全性差、遇到較差地勢施工難度系數(shù)高,工期長,建造成本高的技術(shù)問題,同時基于掛籃與桁架式導(dǎo)梁的邊跨現(xiàn)澆段施工結(jié)構(gòu)結(jié)構(gòu)簡單、施工方便、穩(wěn)定性好。為解決上述技術(shù)問題,本專利技術(shù)采用的技術(shù)方案是:基于掛籃與桁架式導(dǎo)梁的邊跨現(xiàn)澆段施工結(jié)構(gòu),其特征在于:包括掛籃、掛籃后橫梁、位于所述掛籃后橫梁下方 ...
【技術(shù)保護(hù)點】
基于掛籃與桁架式導(dǎo)梁的邊跨現(xiàn)澆段施工結(jié)構(gòu),其特征在于:包括掛籃(1)、掛籃后橫梁(4)、位于所述掛籃后橫梁(4)下方的掛籃前橫梁(3)、架設(shè)在所述掛籃前橫梁(3)和掛籃后橫梁(4)上的桁架式導(dǎo)梁系統(tǒng)(5)和設(shè)置在桁架式導(dǎo)梁系統(tǒng)(5)上方兩側(cè)的側(cè)模系統(tǒng)(6)、以及預(yù)壓載系統(tǒng)和平衡配重系統(tǒng);所述桁架式導(dǎo)梁系統(tǒng)(5)包括多榀的單元桁架(5?1)以及設(shè)置在單元桁架(5?1)上方的底模(5?2),多榀所述單元桁架(5?1)并列布設(shè),所述單元桁架(5?1)包括上弦桿(5?1?1)和下弦桿(5?1?2),以及連接上弦桿(5?1?1)和下弦桿(5?1?2)的腹桿,所述上弦桿(5?1?1)的兩端分別架設(shè)在邊墩(2)和掛籃后橫梁(4)上,所述下弦桿(5?1?2)處于掛籃前橫梁(3)上方,所述上弦桿(5?1?1)和下弦桿(5?1?2)平行設(shè)置,所述腹桿由豎向腹桿(5?1?3)和斜向腹桿(5?1?4)組成,所述豎向腹桿(5?1?3)和斜向腹桿(5?1?4)的數(shù)量均為多根,多根所述斜向腹桿(5?1?4)的首尾相連,相鄰兩根所述斜向腹桿(5?1?4)之間設(shè)置有一根豎向腹桿(5?1?3),多根所述豎向腹桿(5?1? ...
【技術(shù)特征摘要】
1.基于掛籃與桁架式導(dǎo)梁的邊跨現(xiàn)澆段施工結(jié)構(gòu),其特征在于:包括掛籃(1)、掛籃后橫梁(4)、位于所述掛籃后橫梁(4)下方的掛籃前橫梁(3)、架設(shè)在所述掛籃前橫梁(3)和掛籃后橫梁(4)上的桁架式導(dǎo)梁系統(tǒng)(5)和設(shè)置在桁架式導(dǎo)梁系統(tǒng)(5)上方兩側(cè)的側(cè)模系統(tǒng)(6)、以及預(yù)壓載系統(tǒng)和平衡配重系統(tǒng);所述桁架式導(dǎo)梁系統(tǒng)(5)包括多榀的單元桁架(5-1)以及設(shè)置在單元桁架(5-1)上方的底模(5-2),多榀所述單元桁架(5-1)并列布設(shè),所述單元桁架(5-1)包括上弦桿(5-1-1)和下弦桿(5-1-2),以及連接上弦桿(5-1-1)和下弦桿(5-1-2)的腹桿,所述上弦桿(5-1-1)的兩端分別架設(shè)在邊墩(2)和掛籃后橫梁(4)上,所述下弦桿(5-1-2)處于掛籃前橫梁(3)上方,所述上弦桿(5-1-1)和下弦桿(5-1-2)平行設(shè)置,所述腹桿由豎向腹桿(5-1-3)和斜向腹桿(5-1-4)組成,所述豎向腹桿(5-1-3)和斜向腹桿(5-1-4)的數(shù)量均為多根,多根所述斜向腹桿(5-1-4)的首尾相連,相鄰兩根所述斜向腹桿(5-1-4)之間設(shè)置有一根豎向腹桿(5-1-3),多根所述豎向腹桿(5-1-3)沿上弦桿(5-1-1)和下弦桿(5-1-2)的長度方向并列設(shè)置,所述底模(5-2)包括橫架在多榀單元桁架(5-1)上方的主分配梁(5-2-1),所述主分配梁(5-2-1)的數(shù)量為多榀,多榀所述主分配梁(5-2-1)并列設(shè)置,相鄰兩榀所述主分配梁(5-2-1)之間布設(shè)有方木(5-2-3),多個所述方木(5-2-3)與多榀主分配梁(5-2-1)相互平行設(shè)置,所述方木(5-2-3)和主分配梁(5-2-1)上方鋪設(shè)有竹膠板(5-2-2),所述竹膠板(5-2-2)通過連接件(5-2-4)與方木(5-2-3)連接。2.根據(jù)權(quán)利要求1所述的基于掛籃與桁架式導(dǎo)梁的邊跨現(xiàn)澆段施工結(jié)構(gòu),其特征在于:所述側(cè)模系統(tǒng)(6)包括側(cè)模板(6-1)以及用來支撐側(cè)模板(6-1)的加固支架(6-2),所述側(cè)模板(6-1)設(shè)置在桁架式導(dǎo)梁系統(tǒng)(5)上部的兩側(cè),所述側(cè)模板(6-1)和桁架式導(dǎo)梁系統(tǒng)(5)之間形成用于現(xiàn)澆混凝土的成型腔。3.根據(jù)權(quán)利要求2所述的基于掛籃與桁架式導(dǎo)梁的邊跨現(xiàn)澆段施工結(jié)構(gòu),其特征在于:所述加固支架(6-2)包括安裝在側(cè)模板(6-1)外側(cè)且相互平行的上水平直桿(6-2-1)和下水平直桿(6-2-2);所述上水平直桿(6-2-1)和下水平直桿(6-2-2)之間設(shè)置有兩根斜桿(6-2-4)和兩根立桿(6-2-3),兩根所述立桿(6-2-3)并列設(shè)置,兩根所述斜桿(6-2-4)呈“V”型結(jié)構(gòu),兩根所述斜桿(6-2-4)的下端均延伸至上弦桿(5-1-1)且均與上弦桿(5-1-1)連接;所述側(cè)模板(6-1)的上部和上水平直桿(6-2-1)之間設(shè)置有三根斜桿(6-2-4)和三根立桿(6-2-3),三根所述斜桿(6-2-4)由第一斜桿、第二斜桿和第三斜桿組成,三根所述立桿(6-2-3)由并列設(shè)置的第一立桿、第二立桿和第三立桿組成,所述第一斜桿的一端固定在側(cè)模板(6-1)上,所述第一斜桿的另一端固定在第一立桿的下端,所述第二斜桿和第三斜桿呈“V”型結(jié)構(gòu)。4.根據(jù)權(quán)利要求1所述的基于掛籃與桁架式導(dǎo)梁的邊跨現(xiàn)澆段施工結(jié)構(gòu),其特征在于:所述上弦桿(5-1-1)搭設(shè)在所述邊墩(2)上的一端的下方設(shè)置有墊片(7),所述墊片(7)為鋼板墊片。5.根據(jù)權(quán)利要求1所述的基于掛籃與桁架式導(dǎo)梁的邊跨現(xiàn)澆段施工結(jié)構(gòu),其特征在于:所述上弦桿(5-1-1)搭設(shè)在所述掛籃后橫梁(4)上的一端上方設(shè)置有翼板加強(qiáng)板(8),以及所述上弦桿(5-1-1)搭設(shè)在所述掛籃后橫梁(4)上的一端側(cè)面設(shè)置有腹板加強(qiáng)板(9)。6.一種對權(quán)利要求1所述的施工結(jié)構(gòu)進(jìn)行施工的方法,其特征在于,該方法包括以下步驟:步驟一、邊墩表面清理及掛籃位置調(diào)整:將掛籃(1)移至軌道距離中跨懸梁砼端面50cm-60cm厘米處并將邊墩(2)表面清理干凈;步驟二、掛籃前橫梁和掛籃后橫梁位置調(diào)整:將掛籃前橫梁(3)移至掛籃后橫梁(4)的下方,使掛籃前橫梁(3)和掛籃后橫梁(4)沿豎直方向具有高度差;步驟三、桁架式導(dǎo)梁系統(tǒng)安裝:步驟301、多榀單元桁架預(yù)制:預(yù)制多榀的單元桁架(5-1),其中每榀的單元桁架(5...