Combined construction method of the invention discloses an assembling folding construction operation and unloading platform and tool lifting type stair, stair lift installation tool in the well assembled building, used for construction workers on the stairs in the channel, the assembly building in before precast concrete stairs corresponding to the floor without lifting placement, the folding operation and unloading platform hanging to the stairwell floors, the folding operation and unloading platform at both ends of the lap in ladder beam prefabricated corresponding, used for workpiece turnover and operating platform. The invention uses elevator and stair space, vertical staircase structure is arranged in the elevator shaft, the elevator shaft used as construction channel construction, at the same time folding operation and unloading platform lap in the stairwell on the corresponding ladder beam prefabricated staircase, the staircase used as building workpiece turnover space, both to meet the prefabricated construction structure of beautiful green construction requirements, and solves the problem of the construction personnel turnover and the workpiece.
【技術(shù)實現(xiàn)步驟摘要】
裝配式建筑施工折疊式操作及卸料平臺與工具式樓梯吊裝的組合施工方法
本專利技術(shù)屬于建筑施工
,特別涉及一種裝配式建筑施工折疊式操作及卸料平臺與工具式樓梯吊裝的組合施工方法。
技術(shù)介紹
在傳統(tǒng)的建筑施工中,施工人員的通道及工件的卸料都是沿著建筑外墻搭設(shè)懸挑架或使用整體提升架,并在懸挑架上搭設(shè)卸料平臺并用鋼絲繩連接上層預(yù)埋件。但是在裝配式建筑施工中,由于建筑外墻為預(yù)制剪力墻,因此無法在墻上后期開孔,故無法在建筑外墻搭設(shè)懸挑架作為施工人員臨時的施工通道及卸料平臺,而采用預(yù)制樓梯的施工方式時,預(yù)制樓梯都是在對應(yīng)樓層的整體結(jié)構(gòu)施工完畢后,再將預(yù)制樓梯吊至對應(yīng)位置進(jìn)行施工安裝,這樣則造成在取消了外部爬架作為施工通道后,若采用預(yù)制樓梯的施工方式,使得沒有了操作人員的施工通道,而現(xiàn)有建筑施工中施工建筑的電梯間均是采用封閉保護(hù)的方式,以避免人員墜落事故,同時在建筑施工中需要周轉(zhuǎn)大量材料,若建筑外無法搭設(shè)卸料平臺,也造成工件無法進(jìn)行周轉(zhuǎn)。
技術(shù)實現(xiàn)思路
本專利技術(shù)的目的在于:針對上述存在的問題,提供一種能夠充分利用建筑電梯井作為施工人員的施工通道,同時利用樓梯間進(jìn)行建筑工件周轉(zhuǎn)的裝配式建筑施工折疊式操作及卸料平臺與工具式樓梯吊裝的組合施工方法。本專利技術(shù)的技術(shù)方案是這樣實現(xiàn)的:裝配式建筑施工折疊式操作及卸料平臺與工具式樓梯吊裝的組合施工方法,其特征在于:在所述裝配式建筑的電梯井內(nèi)安裝工具式樓梯,用于供施工人員上下的通道,在所述裝配式建筑的樓梯間中,在對應(yīng)樓層的預(yù)制樓梯未吊裝安放之前,將折疊式操作及卸料平臺吊至樓梯間內(nèi)相應(yīng)樓層,所述折疊式操作及卸料平臺的兩端搭接在預(yù)制樓梯對應(yīng)的 ...
【技術(shù)保護(hù)點(diǎn)】
裝配式建筑施工折疊式操作及卸料平臺與工具式樓梯吊裝的組合施工方法,其特征在于:在所述裝配式建筑的電梯井內(nèi)安裝工具式樓梯,用于供施工人員上下的通道,在所述裝配式建筑的樓梯間中,在對應(yīng)樓層的預(yù)制樓梯未吊裝安放之前,將折疊式操作及卸料平臺吊至樓梯間內(nèi)相應(yīng)樓層,所述折疊式操作及卸料平臺的兩端搭接在預(yù)制樓梯對應(yīng)的梯梁上,用于供工件的周轉(zhuǎn)及操作平臺。
【技術(shù)特征摘要】
1.裝配式建筑施工折疊式操作及卸料平臺與工具式樓梯吊裝的組合施工方法,其特征在于:在所述裝配式建筑的電梯井內(nèi)安裝工具式樓梯,用于供施工人員上下的通道,在所述裝配式建筑的樓梯間中,在對應(yīng)樓層的預(yù)制樓梯未吊裝安放之前,將折疊式操作及卸料平臺吊至樓梯間內(nèi)相應(yīng)樓層,所述折疊式操作及卸料平臺的兩端搭接在預(yù)制樓梯對應(yīng)的梯梁上,用于供工件的周轉(zhuǎn)及操作平臺。2.根據(jù)權(quán)利要求1所述的裝配式建筑施工折疊式操作及卸料平臺與工具式樓梯吊裝的組合施工方法,其特征在于:所述工具式樓梯包括結(jié)構(gòu)框架以及樓梯總成,所述結(jié)構(gòu)框架由立桿和橫桿組成,所述工具式樓梯在裝配式建筑的電梯井內(nèi)安裝的具體施工方法是:首先,在電梯井澆筑混凝土前,預(yù)先安裝預(yù)埋構(gòu)件,若從一層或地下室安裝,校正工具式樓梯的結(jié)構(gòu)框架后便可安裝;若從二層安裝,則先在電梯井隨電梯口豎向鋪設(shè)至少三條工字鋼,所述工字鋼與工具式樓梯的立桿在同一平面,再放置結(jié)構(gòu)框架矯正;其次,將結(jié)構(gòu)框架上設(shè)置的連墻構(gòu)件與電梯井內(nèi)設(shè)置的預(yù)埋構(gòu)件對應(yīng)連接,并在結(jié)構(gòu)框架上安裝樓梯板、休息平臺和防護(hù)欄桿;最后,將樓梯總成與結(jié)構(gòu)框架連接固定,所述樓梯總成在電梯井內(nèi)形成建筑施工通道。3.根據(jù)權(quán)利要求2所述的裝配式建筑施工折疊式操作及卸料平臺與工具式樓梯吊裝的組合施工方法,其特征在于:所述連墻構(gòu)件由連接座和定位銷組成,所述連接座與結(jié)構(gòu)框架固定連接,所述定位銷豎向布置且上端部與連接座固定連接,所述預(yù)埋構(gòu)件由固定件和支撐耳板組成,所述固定件預(yù)埋在電梯井的混凝土墻內(nèi),所述支撐耳板與固定件固定連接且置于電梯井混凝土墻外,在所述支撐耳板上設(shè)置有插孔,安裝時,所述連墻構(gòu)件的定位銷從上往下插入支撐耳板的插孔,所述連墻構(gòu)件的連接座置于支撐耳板的上端面。4.根據(jù)權(quán)利要求1、2或3所述的裝配式建筑施工折疊式操作及卸料平臺與工具式樓梯吊裝的組合施工方法,其特征在于:所述折疊式操作及卸料平臺包括堆放平臺,在所述堆放平臺兩端對稱地設(shè)置有與之鉸接的可折疊搭接部,通過塔吊將折疊式操作及卸料平臺吊至樓梯間內(nèi),當(dāng)所述折疊式操作及卸料平臺在吊裝過程中時,所述堆放平臺兩端的可折疊搭接部自然下垂,當(dāng)所述折疊式操作及卸料平臺吊至樓梯間內(nèi)相應(yīng)樓層時,所述堆放平臺...