The present invention discloses installation technology of winding glass steel septic tank, which comprises the following steps, foundation pit excavation and treatment, product positioning line is determined according to the engineering design, according to the selected model dimensions are given during excavation of foundation pit excavation to a predetermined elevation, the bottom cushion compaction, removing sand entrained in large masonry or hard debris prepare the whole, and leveling the dense type septic tank installation, installation or combination of groundwater and soil poor soil, covered with pebbles or gravel compaction, provided concrete cushion, cushion concrete with sand cushion, the both sides with the soil filled; backfill, septic tank in place after filling in time, the lower part of the pool surrounded by sand filled, backfill stones are eliminated, backfill should be compacted layer, each layer by 30mm, must make the pool around backfill compacting clearing; Well, the designer can select the clear cut and fill the hole according to the specific conditions. After the backfill has reached the construction specification requirements, the upper part of the pool body can be built to clear the shaft.
【技術(shù)實現(xiàn)步驟摘要】
纏繞玻璃鋼化糞池的安裝工藝
本專利技術(shù)屬于玻璃鋼
,尤其是纏繞玻璃鋼化糞池的安裝工藝。
技術(shù)介紹
傳統(tǒng)的化糞池主要為磚混結(jié)構(gòu),也有鋼筋砼結(jié)構(gòu)的,但是制作工藝都比較簡單,沒有什么技術(shù)含量,易滲漏、易堵塞,水處理效果也不好,污染周圍環(huán)境,增加了下游污水處理廠的負擔,且施工程序復雜,工期長,不能滿足環(huán)保部門及建筑方的要求,所以,市場亟待一種更適合更完美的產(chǎn)品。而手糊玻璃鋼化糞池產(chǎn)品外觀凹凸不平,色澤不均,使用一段時間后制品外觀發(fā)送較大變化,開始出現(xiàn)分層、裂紋、脫皮、漏水現(xiàn)象,很難同時滿足制品對于強度和抗?jié)B漏、防腐蝕的要求。
技術(shù)實現(xiàn)思路
本專利技術(shù)旨在克服現(xiàn)有技術(shù)的缺陷,提供一種纏繞玻璃鋼化糞池的安裝工藝,永不滲漏,設(shè)置地點選擇性大,擺放靈活。為了解決上述技術(shù)問題,本專利技術(shù)提供以下技術(shù)方案:纏繞玻璃鋼化糞池的安裝工藝,其特征在于:包括以下步驟,基坑開挖及處理,產(chǎn)品定位放線根據(jù)工程設(shè)計圖確定,按所選型號所給尺寸開挖基坑,基坑開挖到預定標高時,底部灰土墊層夯實,剔除砂中夾帶在較大的磚石或硬雜物,并找平密實,準備整體型化糞池安裝就位,組合安裝或有地下水且基土土質(zhì)差時,鋪上卵石或碎石層夯實,其上設(shè)置混凝土墊層,混凝土墊層上鋪100mm砂墊層,罐體兩側(cè)用素土填實;分層回填,化糞池就位后及時回填,覆土厚度為0.3-1.5M,池下部四周用砂土填實,回填土中的石塊就剔除,回填土應分層夯實,每層按30mm進行,回填時切忌不能局部猛力沖擊,必須使池子周圍回填土密實;清掏井,設(shè)計人員可根據(jù)具體情況進行選用清掏井,回填達到施工規(guī)范要求后池體上部可砌清掏井。進一步,纏繞玻璃鋼為普通型 ...
【技術(shù)保護點】
纏繞玻璃鋼化糞池的安裝工藝,其特征在于:包括以下步驟,基坑開挖及處理,產(chǎn)品定位放線根據(jù)工程設(shè)計圖確定,按所選型號所給尺寸開挖基坑,基坑開挖到預定標高時,底部灰土墊層夯實,剔除砂中夾帶在較大的磚石或硬雜物,并找平密實,準備整體型化糞池安裝就位,組合安裝或有地下水且基土土質(zhì)差時,鋪上卵石或碎石層夯實,其上設(shè)置混凝土墊層,混凝土墊層上鋪100mm砂墊層,罐體兩側(cè)用素土填實;分層回填,化糞池就位后及時回填,覆土厚度為0.3?1.5M,池下部四周用砂土填實,回填土中的石塊就剔除,回填土應分層夯實,每層按30mm進行,回填時切忌不能局部猛力沖擊,必須使池子周圍回填土密實;清掏井,設(shè)計人員可根據(jù)具體情況進行選用清掏井,回填達到施工規(guī)范要求后池體上部可砌清掏井。
【技術(shù)特征摘要】
1.纏繞玻璃鋼化糞池的安裝工藝,其特征在于:包括以下步驟,基坑開挖及處理,產(chǎn)品定位放線根據(jù)工程設(shè)計圖確定,按所選型號所給尺寸開挖基坑,基坑開挖到預定標高時,底部灰土墊層夯實,剔除砂中夾帶在較大的磚石或硬雜物,并找平密實,準備整體型化糞池安裝就位,組合安裝或有地下水且基土土質(zhì)差時,鋪上卵石或碎石層夯實,其上設(shè)置混凝土墊層,混凝土墊層上鋪100mm砂墊層,罐體兩側(cè)用素土填實;分層回填,...