For the final joint structure of the tunnel, which relates to the technical field of transportation; the foundation cushion is arranged on both sides of the adjacent long pipe section, both sides of the adjacent long pipe sections are installed on the push system, Jack, adjacent to both sides of the long tube has side sealing wall are arranged in two sides of the long section, two end pipe section of the set there was a double wedge, and the two end surface is provided with the contact surface and the rubber sealing strip, a double wedge final joint is arranged between the two side ends of the adjacent long pipe section, double wedge on both sides of the final joint is also arranged on the contact surface and the rubber sealing belt; both sides of the adjacent long tube section and double wedge end joint connected by bolts; grouting is arranged between adjacent to both sides of the long pipe section of the final joint base and foundation cushion. The final joint of the immersed pipe of the invention has the advantages of small structure, convenient prefabrication, easy construction quality guarantee, difficult construction, double sided wedge, easy water stopping belt compression, prefabricated component underwater butting, and fast construction speed.
【技術(shù)實(shí)現(xiàn)步驟摘要】
用于沉管隧道的最終接頭結(jié)構(gòu)形式
本專利技術(shù)涉及交通運(yùn)輸
,具體涉及用于沉管隧道的最終接頭結(jié)構(gòu)形式。
技術(shù)介紹
我國(guó)幅員遼闊,海岸線長(zhǎng),江、河、湖泊和島嶼眾多,近年來(lái)多采用對(duì)環(huán)境、景觀影響小的水下隧道方式,其中相當(dāng)一部分水下隧道都采用沉管法建設(shè)。沉管法隧道最終接頭是實(shí)現(xiàn)隧道最終貫通的重要連接結(jié)構(gòu),也是整個(gè)工程關(guān)鍵工序中的重點(diǎn)環(huán)節(jié)。以往水下隧道最終接頭施工往往是采用在接頭四周水下安裝止水鋼封板后,再在封板內(nèi)部現(xiàn)澆接頭鋼筋混凝土結(jié)構(gòu),施工工藝復(fù)雜,周期較長(zhǎng),水下鋼封板安裝伴隨長(zhǎng)時(shí)間的人工水下作業(yè)。如何實(shí)現(xiàn)沉管法隧道最終接頭的快速、方便施工,一直是隧道沉管工法探索的方向之一。
技術(shù)實(shí)現(xiàn)思路
本專利技術(shù)的目的在于針對(duì)現(xiàn)有技術(shù)的缺陷和不足,提供一種施工質(zhì)量容易保證、施工難度小、施工速度快的沉管隧道最終接頭的結(jié)構(gòu)形式。為實(shí)現(xiàn)上述目的,本專利技術(shù)采用的技術(shù)方案是:它包含基礎(chǔ)墊層、千斤頂頂推系統(tǒng)、兩側(cè)相鄰長(zhǎng)管節(jié)、端封墻、接觸面、雙面楔形最終接頭、螺栓、注漿、橡膠止水帶;所述的基礎(chǔ)墊層上設(shè)置有兩側(cè)相鄰長(zhǎng)管節(jié),兩側(cè)相鄰長(zhǎng)管節(jié)上均安裝有千斤頂頂推系統(tǒng),兩側(cè)相鄰長(zhǎng)管節(jié)內(nèi)均設(shè)置有端封墻,兩側(cè)相鄰長(zhǎng)管節(jié)的兩個(gè)端面設(shè)置有呈雙面楔形,且兩個(gè)端面設(shè)置有接觸面和橡膠止水帶,兩側(cè)相鄰長(zhǎng)管節(jié)的兩個(gè)端面之間設(shè)置有雙面楔形最終接頭,雙面楔形最終接頭的兩側(cè)也設(shè)置有接觸面和橡膠止水帶;所述的兩側(cè)相鄰長(zhǎng)管節(jié)與雙面楔形最終接頭通過(guò)螺栓連接;所述的兩側(cè)相鄰長(zhǎng)管節(jié)的最終接頭底部與基礎(chǔ)墊層之間設(shè)置注漿。作為優(yōu)選,所述的兩側(cè)相鄰長(zhǎng)管節(jié)與雙面楔形最終接頭之間還設(shè)置有橡膠板。作為優(yōu)選,所述的雙面楔形最終接頭的兩側(cè)面與兩 ...
【技術(shù)保護(hù)點(diǎn)】
用于沉管隧道的最終接頭結(jié)構(gòu)形式,其特征在于:它包含基礎(chǔ)墊層、千斤頂頂推系統(tǒng)、兩側(cè)相鄰長(zhǎng)管節(jié)、端封墻、接觸面、雙面楔形最終接頭、螺栓、注漿、橡膠止水帶;所述的基礎(chǔ)墊層上設(shè)置有兩側(cè)相鄰長(zhǎng)管節(jié),兩側(cè)相鄰長(zhǎng)管節(jié)上均安裝有千斤頂頂推系統(tǒng),兩側(cè)相鄰長(zhǎng)管節(jié)內(nèi)均設(shè)置有端封墻,兩側(cè)相鄰長(zhǎng)管節(jié)的兩個(gè)端面設(shè)置有呈雙面楔形,且兩個(gè)端面設(shè)置有接觸面和橡膠止水帶,兩側(cè)相鄰長(zhǎng)管節(jié)的兩個(gè)端面之間設(shè)置有雙面楔形最終接頭,雙面楔形最終接頭的兩側(cè)也設(shè)置有接觸面和橡膠止水帶;所述的兩側(cè)相鄰長(zhǎng)管節(jié)與雙面楔形最終接頭通過(guò)螺栓連接;所述的兩側(cè)相鄰長(zhǎng)管節(jié)的最終接頭底部與基礎(chǔ)墊層之間設(shè)置注漿。
【技術(shù)特征摘要】
1.用于沉管隧道的最終接頭結(jié)構(gòu)形式,其特征在于:它包含基礎(chǔ)墊層、千斤頂頂推系統(tǒng)、兩側(cè)相鄰長(zhǎng)管節(jié)、端封墻、接觸面、雙面楔形最終接頭、螺栓、注漿、橡膠止水帶;所述的基礎(chǔ)墊層上設(shè)置有兩側(cè)相鄰長(zhǎng)管節(jié),兩側(cè)相鄰長(zhǎng)管節(jié)上均安裝有千斤頂頂推系統(tǒng),兩側(cè)相鄰長(zhǎng)管節(jié)內(nèi)均設(shè)置有端封墻,兩側(cè)相鄰長(zhǎng)管節(jié)的兩個(gè)端面設(shè)置有呈雙面楔形,且兩個(gè)端面設(shè)置有接觸面和橡膠止水帶,兩側(cè)相鄰長(zhǎng)管節(jié)的兩個(gè)端面之間設(shè)置有雙面楔形最終接頭,雙面楔形最終接頭的兩側(cè)也設(shè)置有接觸面和橡膠止水帶;所述的兩側(cè)相鄰長(zhǎng)...
【專利技術(shù)屬性】
技術(shù)研發(fā)人員:賀維國(guó),范國(guó)剛,范建國(guó),宋儀,周華貴,褚凱,沈永芳,宋超業(yè),
申請(qǐng)(專利權(quán))人:中鐵隧道勘測(cè)設(shè)計(jì)院有限公司,中鐵第六勘察設(shè)計(jì)院集團(tuán)有限公司,
類型:發(fā)明
國(guó)別省市:天津,12