The invention discloses a dam structure, which is arranged every 4 to 6m concrete pier, concrete is arranged between the adjacent concrete pier arch, concrete arch plate adopts precast slab, concrete arch plate pre buried T shaped reinforcement, concrete arch plate is provided with drainage holes, concrete arch concrete arch lateral plate is arranged. Concrete and concrete arch arch plate flush distance concrete pier 0.8 ~ 1.1m set back lining concrete column, column pier and backing connecting wall is arranged between the columns, even the walls along the vertical intervals of 1.5 ~ 2.5m concrete coupling beams, the adjacent backing column is arranged between the back wall lining, back lining wall by building blocks or bricks the laying of backing, backing wall is arranged between the column and the tie bar are connected along the vertical wall lining every 1.5 ~ 2.5m set back lining wall beam, multi rib wall is arranged between the back wall and concrete arch rib and concrete wall plate. The T rib is arranged between the arch plates, and the concrete rib beam is arranged along the vertical wall every 1.5 to 2.5m along the vertical direction, and the sandy soil or clay is filled between the concrete arch plate and the back lining wall.
【技術實現(xiàn)步驟摘要】
擋水壩結構
本專利技術涉及一種擋水壩結構,涉及一種水利領域。
技術介紹
傳統(tǒng)的擋水壩開挖至底部再進行澆筑混凝土或者砌筑擋墻,這種方法在施工過程中容易出現(xiàn)土方坍塌現(xiàn)象。如果要順利施工要做專門的支護結構,如果不做專門的支護結構顯然會節(jié)省很多成本,還會減少工期。另外傳統(tǒng)的重力式擋水壩成本較高。因此如果采用合理的擋水壩結構既可以確保安全又可以節(jié)省造價是工程人員面對的課題。
技術實現(xiàn)思路
本專利技術是提供一種擋水壩結構,解決擋水壩在施工過程土方坍塌以及工程成本高的問題。本專利技術中每隔4~6m設置混凝土柱墩,混凝土柱墩為直徑為0.9~1.5m的混凝土圓柱,相鄰混凝土柱墩之間設置混凝土拱板,混凝土拱板采用預制板,預制板相對于現(xiàn)澆板可以加快施工進度,混凝土拱板厚度為50~80mm,縱向正筋和負筋直徑相同并對稱布置,最小配筋率不小于0.2%。混凝土拱板預埋T形筋,混凝土拱板每隔1.5~2m2留有泄水孔,混凝土拱板沿豎向每隔1.5~2.5m設置混凝土拱梁,混凝土拱梁高度為150~250mm,混凝土拱梁外側與混凝土拱板外側齊平,混凝土拱梁內設置抗扭筋,抗扭筋直徑為16~20mm,距離混凝土柱墩0.8~1.1m設置背襯柱,背襯柱截面寬度和長度為200~300mm,混凝土柱墩與背襯柱之間設置連墻,連墻沿豎向每隔1.5~2.5m設置混凝土連梁,混凝土連梁寬度為200~300mm,高度為200~300mm,相鄰背襯柱之間設置背襯墻,背襯墻寬度為200~300mm,背襯墻采用砌塊或者磚塊組砌,背襯柱與背襯墻之間設置拉結筋進行連結,拉結筋設置間距為500mm,背襯墻沿豎向每隔1.5~2.5m ...
【技術保護點】
一種擋水壩結構,其特征是每隔4~6m設置混凝土柱墩,相鄰混凝土柱墩之間設置混凝土拱板,混凝土拱板采用預制板,混凝土拱板厚度為50~80mm,混凝土拱板預埋T形筋,混凝土拱板留有泄水孔,混凝土拱板設置混凝土拱梁,混凝土拱梁外側與混凝土拱板外側齊平,距離混凝土柱墩0.8~1.1m設置背襯柱,背襯柱截面寬度和長度為200~300mm,混凝土柱墩與背襯柱之間設置連墻,連墻沿豎向每隔1.5~2.5m設置混凝土連梁,混凝土連梁寬度為200~300mm,高度為200~300mm,相鄰背襯柱之間設置背襯墻,背襯墻寬度為200~300mm,背襯墻采用砌塊或者磚塊組砌,背襯柱與背襯墻之間設置拉結筋進行連結,拉結筋設置間距為500mm,背襯墻沿豎向每隔1.5~2.5m設置背襯墻梁,背襯墻與混凝土拱板之間設置多道肋墻,相鄰道肋墻間距為0.9~1.2mm,肋墻采用砌塊或者磚塊組砌,肋墻與混凝土拱板之間設置T形筋進行連結,T形筋設置間距為500mm,肋墻沿豎向每隔1.5~2.5m設置混凝土肋梁,混凝土肋梁高度為200~300mm;混凝土拱板和背襯墻之間填充砂性土或者粘土;混凝土拱板矢跨比根據擋水壩深度進行設置;對 ...
【技術特征摘要】
1.一種擋水壩結構,其特征是每隔4~6m設置混凝土柱墩,相鄰混凝土柱墩之間設置混凝土拱板,混凝土拱板采用預制板,混凝土拱板厚度為50~80mm,混凝土拱板預埋T形筋,混凝土拱板留有泄水孔,混凝土拱板設置混凝土拱梁,混凝土拱梁外側與混凝土拱板外側齊平,距離混凝土柱墩0.8~1.1m設置背襯柱,背襯柱截面寬度和長度為200~300mm,混凝土柱墩與背襯柱之間設置連墻,連墻沿豎向每隔1.5~2.5m設置混凝土連梁,混凝土連梁寬度為200~300mm,高度為200~300mm,相鄰背襯柱之間設置背襯墻,背襯墻寬度為200~300mm,背襯墻采用砌塊或者磚塊組砌,背襯柱與背襯墻之間設置拉結筋進行連結,拉結筋設置間距為500mm,背襯墻沿豎向每隔1.5~2.5m設置背襯墻梁,背襯墻與混凝土拱板之間設置多道肋墻,相鄰道肋墻間距為0.9~1.2mm,肋墻采用砌塊或者磚塊組砌,肋墻與混凝土拱板之間設置T形筋進行連結,T形筋設置間距為500mm,肋墻沿豎向每隔1.5~2.5m設置混凝土肋梁,混凝土肋梁高度為200~300mm;混凝土拱板和背襯墻之...