The invention discloses an underground adding layer construction method of an existing building, which relates to the construction field of a building. The advantages of the method are as follows: to reduce the influence of foundation towing and changing on the subway structure when adding layers to an existing building underground, the technical scheme essentials are as follows: step 1: shallow excavation, the wall load is underpinned to the static pressure pile foundation; step 2: Enclosure around the original building; Step 3: After the completion of grouting reinforcement 24 hours, earth excavation; Step 4: Excavation to the designated elevation, pouring the basement structure, including floor, external wall, roof, the original static pressure pile indoor and basement pouring into one, do a good job of waterproof treatment at the junction; Improve the original building and improve the basement. The waterproof and impervious performance of the basement; Step 5: Finally, remove the sandwich wall beam, reaction beam, backfill the outdoor earthwork, complete the structural renovation and repair work.
【技術(shù)實(shí)現(xiàn)步驟摘要】
已有建筑的地下加層施工方法
本專利技術(shù)涉及建筑施工領(lǐng)域,特別涉及一種已有建筑的地下加層施工方法。
技術(shù)介紹
改革開放以來,我國(guó)的國(guó)民經(jīng)濟(jì)實(shí)現(xiàn)了又好又快發(fā)展,城鎮(zhèn)化建設(shè)出現(xiàn)了一片繁榮的景象。人們的生活水平得到了很大提高,人們對(duì)于建筑用地的需求也越來越大,對(duì)于原有房屋的使用功能和使用面積已不能滿足新的經(jīng)營(yíng)生產(chǎn)需要。而我國(guó)的城鎮(zhèn)土地資源有限,用于建設(shè)用地的土地資源變得越來越少,有序、合理、綜合、高效地開發(fā)利用既有建筑物地下空間資源,成為擴(kuò)充基礎(chǔ)設(shè)施容量,提高城市綜合防災(zāi)能力,提高土地利用效率與節(jié)約土地資源的最為有效的途徑之一,大量的既有建筑因?yàn)闅v史的原因,缺少前瞻性而未設(shè)計(jì)地下停車場(chǎng)等,隨著汽車數(shù)量的增加出現(xiàn)了停車難。因此,對(duì)既有建筑物地下空間的開發(fā)是一項(xiàng)艱巨而迫切的任務(wù)。公開號(hào)為CN104532957A的中國(guó)專利公開了一種原有建筑增設(shè)地下室逆作施工方法,采取在原基礎(chǔ)承臺(tái)四周根據(jù)原有建筑設(shè)計(jì)參數(shù)布置鉆孔壓力注漿樁和承臺(tái),利用鉆孔壓力注漿樁和承臺(tái)支托上部結(jié)構(gòu)框架受力柱,并將承臺(tái)擴(kuò)大以更有效地承受上部框架柱荷載的方式實(shí)現(xiàn)基礎(chǔ)托換,再挖土至設(shè)計(jì)基底標(biāo)高,利用擠壓套筒連接鉆孔壓力注漿樁群并使用高強(qiáng)度灌漿料澆筑新增設(shè)計(jì)樁和框架柱形成的墻柱,然后進(jìn)行墊層、防水、底板等施工,從而完成框架柱逆向向下與基礎(chǔ)底板連接成型,可在保持地上原有建筑風(fēng)格和使用功能的同時(shí)進(jìn)行地下室逆向加層施工,工期較短、施工獨(dú)立、成本低下、綠色環(huán)保,特別適用于多層框架建筑、上部建筑結(jié)構(gòu)風(fēng)格沒有變化、地下室需逆向加層的工程。但是若該原有建筑位于地鐵上方時(shí),采取在原基礎(chǔ)承臺(tái)四周根據(jù)原有建筑設(shè)計(jì)參數(shù)布置鉆孔壓力注 ...
【技術(shù)保護(hù)點(diǎn)】
1.一種已有建筑的地下加層施工方法,其特征在于:包括以下步驟,步驟一:淺層開挖,將墻體荷載托換至靜壓樁(4)樁基礎(chǔ);原有建筑(1)基礎(chǔ)為墻下無筋條形基礎(chǔ),荷載形式為線荷載,通過設(shè)置在原有建筑(1)墻體下端的夾墻梁(2),夾墻梁(2)上設(shè)有反力梁(3),反力梁(3)上設(shè)有延伸向地基壓入靜壓樁(4),夾墻梁(2)將建筑物所有荷載轉(zhuǎn)換至靜壓樁(4),托換結(jié)構(gòu)包括夾墻梁(2)以及反力梁(3),即最終托換結(jié)構(gòu)荷載傳至靜壓樁(4)樁基礎(chǔ),將靜壓樁(4)施工到地鐵隧道主體頂部距離2?3m的位置;步驟二:施做原有建筑(1)周圍圍護(hù)機(jī)構(gòu);墻體采用靜壓樁(4)托換后,樁頂封樁;然后采用注漿對(duì)樁周圍土體進(jìn)行加固;步驟三:注漿加固完成24小時(shí)后,進(jìn)行土方開挖;室內(nèi)土人工挖除,此時(shí),建筑上部荷載均由托換結(jié)構(gòu)傳至樁基礎(chǔ),原有墻下基礎(chǔ)已不承受上部荷載,鑿除該部分砌體;步驟四:開挖至指定標(biāo)高,澆筑地下室結(jié)構(gòu),包括底板(5)、外墻(6)、頂板(7),室內(nèi)原有靜壓樁(4)與地下室澆筑為一體,做好交接處防水處理;步驟五:最后,拆除夾墻梁(2),反力梁(3),將室外土方回填,完成結(jié)構(gòu)改造修繕工作。
【技術(shù)特征摘要】
1.一種已有建筑的地下加層施工方法,其特征在于:包括以下步驟,步驟一:淺層開挖,將墻體荷載托換至靜壓樁(4)樁基礎(chǔ);原有建筑(1)基礎(chǔ)為墻下無筋條形基礎(chǔ),荷載形式為線荷載,通過設(shè)置在原有建筑(1)墻體下端的夾墻梁(2),夾墻梁(2)上設(shè)有反力梁(3),反力梁(3)上設(shè)有延伸向地基壓入靜壓樁(4),夾墻梁(2)將建筑物所有荷載轉(zhuǎn)換至靜壓樁(4),托換結(jié)構(gòu)包括夾墻梁(2)以及反力梁(3),即最終托換結(jié)構(gòu)荷載傳至靜壓樁(4)樁基礎(chǔ),將靜壓樁(4)施工到地鐵隧道主體頂部距離2-3m的位置;步驟二:施做原有建筑(1)周圍圍護(hù)機(jī)構(gòu);墻體采用靜壓樁(4)托換后,樁頂封樁;然后采用注漿對(duì)樁周圍土體進(jìn)行加固;步驟三:注漿加固完成24小時(shí)后,進(jìn)行土方開挖;室內(nèi)土人工挖除,此時(shí),建筑上部荷載均由托換結(jié)構(gòu)傳至樁基礎(chǔ),原有墻下基礎(chǔ)已不承受上部荷載,鑿除該部分砌體;步驟四:開挖至指定標(biāo)高,澆筑地下室結(jié)構(gòu),包括底板(5)、外墻(6)、頂板(7),室內(nèi)原有靜壓樁(4)與地下室澆筑為一體,做好交接處防水處理;步驟五:最后,拆除夾墻梁(2),反力梁(3),將室外土方回填,完成結(jié)構(gòu)改造修繕工作。2.根據(jù)權(quán)利要求1所述的已有建筑的地下加層施工方法,其特征在于:在步驟一之前對(duì)原有建筑(1)上部結(jié)構(gòu)進(jìn)行加固。3.根據(jù)權(quán)利要求1所述的已有建筑的地下加層施工方法,其特征在于:步驟四中地下室結(jié)構(gòu)與原有建筑(1)之間預(yù)留一定空隙,放置隔震支座(8),該過程采用PLC同步控制系統(tǒng)將原有建筑(1)和地下室結(jié)構(gòu)之間空隙增加5mm,放入隔震支座(8)后,再將原有建筑(1)同步下落置于隔震支座(8)上。4.根據(jù)權(quán)利要求1所述的已有建筑的地下加層施工方法,其特征在于:步驟二中采用注漿對(duì)樁周圍土體進(jìn)行加固的具體方式為全...
【專利技術(shù)屬性】
技術(shù)研發(fā)人員:李祥,王長(zhǎng)安,
申請(qǐng)(專利權(quán))人:南京賽力克建設(shè)工程技術(shù)有限公司,
類型:發(fā)明
國(guó)別省市:江蘇,32
還沒有人留言評(píng)論。發(fā)表了對(duì)其他瀏覽者有用的留言會(huì)獲得科技券。