The utility model discloses a multi-functional drainage filter screen for water conservancy and hydropower projects in the field of filtering technology, which includes an installation channel. The inner walls of the upper and lower sides of the installation channel are symmetrically provided with an installation groove, the installation groove is clamped with a drainage filter screen, and the inner cavity of the waterproof box is provided with a motor. In the drainage work, in order to extend the cleaning period of the drainage filter screen, improve the filtering efficiency, start The motor drives the rotary rod and the cleaning brush to clean the sundries attached to the outer wall of the drainage filter screen. When the sundries attached to the outer wall of the drainage filter screen are difficult to clean, rotate the screw rod and the screw rod to make the lifting groove move up and down in the shell. The moving block drives the rubber brush layer and the scraper to move, changing the pressure on the outer wall of the drainage filter screen, and the spring extends The elastic force produced by the shrinkage bar and the elastic rubber strip change can prevent the screw from falling too much, which causes the scraper to scratch the outer wall of the drainage filter screen, and the movable block moves stably under the coordination of the rack and the gear.
【技術(shù)實(shí)現(xiàn)步驟摘要】
水利水電工程用多功能排水過濾網(wǎng)
本技術(shù)涉及過濾
,具體為水利水電工程用多功能排水過濾網(wǎng)。
技術(shù)介紹
在我國農(nóng)業(yè)技術(shù)的快速發(fā)展中,水利水電起到了重要的作用,在水利水電工程維修維護(hù)中,會有大量的含有雜物的污水,因此需要工程排水,為了充分利用水資源,需要對污水進(jìn)行過濾回收再利用,但目前傳統(tǒng)的排水設(shè)備在對污水進(jìn)行過濾時,污水中的雜物容易附著在排水過濾網(wǎng)外壁,縮短了排水過濾網(wǎng)的清潔周期,增加人工成本,且影響過濾的效率,為此,我們提出水利水電工程用多功能排水過濾網(wǎng)。
技術(shù)實(shí)現(xiàn)思路
本技術(shù)的目的在于提供水利水電工程用多功能排水過濾網(wǎng),以解決上述
技術(shù)介紹
中提出的問題。為實(shí)現(xiàn)上述目的,本技術(shù)提供如下技術(shù)方案:水利水電工程用多功能排水過濾網(wǎng),包括安裝通道,所述安裝通道上下兩側(cè)內(nèi)壁對稱設(shè)置有安裝槽,安裝槽內(nèi)卡接有排水過濾網(wǎng),所述排水過濾網(wǎng)左側(cè)外壁設(shè)置有防水箱,所述防水箱內(nèi)腔設(shè)置有電機(jī),所述電機(jī)的輸出端通過聯(lián)軸器設(shè)置有轉(zhuǎn)桿,所述轉(zhuǎn)桿右端貫穿排水過濾網(wǎng)設(shè)置有清潔刷,所述清潔刷左側(cè)與排水過濾網(wǎng)右側(cè)外壁貼合,所述安裝通道底部內(nèi)壁設(shè)置有與清潔刷相配合的排污口,所述排污口左右兩側(cè)內(nèi)壁均鉸接有擋渣板,所述擋渣板中心設(shè)置有插孔,且插孔內(nèi)滑動連接有滑桿,所述滑桿底部與排污口內(nèi)壁固定連接,所述滑桿頂部設(shè)置有限位塊,且限位塊底部與擋渣板頂部貼合,所述滑桿外壁套接有彈簧,所述彈簧頂部與擋渣板底部貼合。進(jìn)一步地,所述清潔刷包括與轉(zhuǎn)桿連接的殼體,所述殼體頂部中心設(shè)置有螺桿,所述螺桿底部延伸至殼體內(nèi)腔連接有升降槽,所述殼體頂部內(nèi)壁 ...
【技術(shù)保護(hù)點(diǎn)】
1.水利水電工程用多功能排水過濾網(wǎng),包括安裝通道(1),其特征在于:所述安裝通道(1)上下兩側(cè)內(nèi)壁對稱設(shè)置有安裝槽,安裝槽內(nèi)卡接有排水過濾網(wǎng)(2),所述排水過濾網(wǎng)(2)左側(cè)外壁設(shè)置有防水箱(3),所述防水箱(3)內(nèi)腔設(shè)置有電機(jī)(4),所述電機(jī)(4)的輸出端通過聯(lián)軸器設(shè)置有轉(zhuǎn)桿(5),所述轉(zhuǎn)桿(5)右端貫穿排水過濾網(wǎng)(2)設(shè)置有清潔刷(6),所述清潔刷(6)左側(cè)與排水過濾網(wǎng)(2)右側(cè)外壁貼合,所述安裝通道(1)底部內(nèi)壁設(shè)置有與清潔刷(6)相配合的排污口(7),所述排污口(7)左右兩側(cè)內(nèi)壁均鉸接有擋渣板(8),所述擋渣板(8)中心設(shè)置有插孔,且插孔內(nèi)滑動連接有滑桿(9),所述滑桿(9)底部與排污口(7)內(nèi)壁固定連接,所述滑桿(9)頂部設(shè)置有限位塊,且限位塊底部與擋渣板(8)頂部貼合,所述滑桿(9)外壁套接有彈簧(10),所述彈簧(10)頂部與擋渣板(8)底部貼合。/n
【技術(shù)特征摘要】
1.水利水電工程用多功能排水過濾網(wǎng),包括安裝通道(1),其特征在于:所述安裝通道(1)上下兩側(cè)內(nèi)壁對稱設(shè)置有安裝槽,安裝槽內(nèi)卡接有排水過濾網(wǎng)(2),所述排水過濾網(wǎng)(2)左側(cè)外壁設(shè)置有防水箱(3),所述防水箱(3)內(nèi)腔設(shè)置有電機(jī)(4),所述電機(jī)(4)的輸出端通過聯(lián)軸器設(shè)置有轉(zhuǎn)桿(5),所述轉(zhuǎn)桿(5)右端貫穿排水過濾網(wǎng)(2)設(shè)置有清潔刷(6),所述清潔刷(6)左側(cè)與排水過濾網(wǎng)(2)右側(cè)外壁貼合,所述安裝通道(1)底部內(nèi)壁設(shè)置有與清潔刷(6)相配合的排污口(7),所述排污口(7)左右兩側(cè)內(nèi)壁均鉸接有擋渣板(8),所述擋渣板(8)中心設(shè)置有插孔,且插孔內(nèi)滑動連接有滑桿(9),所述滑桿(9)底部與排污口(7)內(nèi)壁固定連接,所述滑桿(9)頂部設(shè)置有限位塊,且限位塊底部與擋渣板(8)頂部貼合,所述滑桿(9)外壁套接有彈簧(10),所述彈簧(10)頂部與擋渣板(8)底部貼合。
2.根據(jù)權(quán)利要求1所述的水利水電工程用多功能排水過濾網(wǎng),其特征在于:所述清潔刷(6)包括與轉(zhuǎn)桿(5)連接的殼體(61),所述殼體(61)頂部中心設(shè)置有螺桿(11),所述螺桿(11)底部延伸至殼體(61)內(nèi)腔連接有升降槽(63),所述殼體(61)頂部內(nèi)壁設(shè)置有凹槽,且凹槽內(nèi)卡接有彈性橡膠條(62),所述彈性橡膠條(62)底部與升降槽(63)頂部貼合,所述殼體(61)左右兩側(cè)內(nèi)壁對稱設(shè)置有活動槽,且兩組活...
【專利技術(shù)屬性】
技術(shù)研發(fā)人員:劉波秋,
申請(專利權(quán))人:劉波秋,
類型:新型
國別省市:吉林;22
還沒有人留言評論。發(fā)表了對其他瀏覽者有用的留言會獲得科技券。